UMR Lagrange OCA Nice
  • Directory
  • Intranet
  • Connexion
  • Welcome
      • Back
      • What is Lagrange Laboratory ?
      • How to get there ?
      • Observing services
  • News
  • Research
      • Back
      • Teams
  • Projects
      • Back
      • ANR and ERC
      • Projects in progress
      • Projects in operation
  • Teaching

Select your language

  • Français (FR)
  • English (UK)

SPEED

  • Home
  • Overview
  • Last news
  • Publications
  • Staff
  • Collaborations
  • Teaching
  • Funding
  • Job opportunities

Last news

August 2023: SCC phasing sensor first smile

Details
Last Updated: 21 July 2023

SCC gamma smiley

From the left to the right: ASM (active segmented mirror) representation combining the offset map (NCPA correction) and a smiley face by poking 8 segments of the same piston value, phase measurement using the SCC-PS (γ = 40) and phase measurement using the SCC-PS (γ = 50), where DIT and NDIT are identical. These are initial measurements, work in progress. 

  1. July 2023: SCC-PS piston, tip, and tilt estimators signal sanity check
  2. June 2023: new masks for the Lyot stop stage
  3. May 2023: AITs SCC-PS
  4. February 2023: fine control of the PIAA mirror sags using a ZYGO interferometer
  5. January 2023: Design and integration of a PIAA mirror performance evaluation testbed
  6. July 2022: SPEED enters its exploitation phase
  7. June 2022: residual aberrations corrections using the differential optical transfert function procedure
  8. March 2022: FPM performance control on the separated coronagraphic bench
  9. February 2022: installation of multiple alignment mire to control the state of the bench
  10. December 2021: separate coronagraphic test bench operational
  11. August 2021: validation of the algorithm for fine re-alignment of the coronagraph in the visible channel
  12. July 2021: alignment of the PIAACMC mirrors
  13. June 2021: pupil imaging mode on science camera
  14. May 2021: SPEED is equipped with a new NiT HiPe SenS camera to replace the RASOIR camera
  15. February 2021: Kilo-C DMs (Boston M.) flat maps obtained at various voltages
  16. December 2020: improvement of the Kilo-C DMs (Boston M.) flattening
  17. November 2020: RASOIR the near-infrared camera is installed on the bench
  18. October 2020: DM1 (Kilo-C) from Boston Micromachines is installed on the bench
  19. September 2020: First light in the near-infrared
  20. July 2020: modification of the light source module of the bench
  21. June 2020: Cleaning of the dichroïc with an optical micro mask
  22. March 2020: Gearing up the near-infrared RASOIR camera (ESO)
  23. February 2020: assembly and pre-alignment of the PIAA mirrors stage
  24. January 2020: assembly and pre-alignment of the optical modules of the NiR path
  25. December 2019: First light in the visible path
  26. October 2019: Validation of the new SPEED source module
  27. July 2019: Development of the third user control interface of the bench
  28. June 2019: Development of the second user control interface of the bench
  29. April 2019: Metrological evaluation of the PIAACMC components
  30. February 2019: preparation of the NiR opto-mechanical parts
  31. January 2019: PIAACMC delivery by SILIOS Technologies
  32. August 2018: Development of the first user control interface of the bench
  33. July 2018: The call for tender for the PIAACMC manufacturing is closed
  34. July 2018: Star simulator installation and visible path AIT
  35. June 2018: Integral sphere installation
  36. April 2018: Delivery of the OAPs of the bench from the OCA optical shop
  37. January 2018: PIAACMC design finalization
  38. October 2017: Pierre Janin-Potiron PhD defense
  39. July 2017: First tests of the fine cophasing sensor SCC-PS on a side testbed
  40. June 2017: Mathilde Beaulieu PhD Defense
  41. June 2017: Out-of-pupil single-DM dark hole experiment on a side testbed
  42. May 2017: Installation of the bench cover
  43. March 2017: Development of a local solution for the hygrometry control for the deformable mirrors
  44. January 2017: Telescope simulator finalization
  45. March 2016: Delivery of the first OAP of the bench from the OCA optical shop
  46. April 2014: Delivery of the Boston Micromachines Kilo-C mirrors et initial testing
  47. April 2014: Delivery of the segmented deformable mirror IRIS AO PTT489 and initial testing

UMR LAGRANGE

Observatoire de la Côte d’Azur
Boulevard de l’Observatoire
CS 34229 - F 06304 NICE Cedex 4
Tél. : +33 (0)4 92 00 30 11
Fax : +33 (0)4 92 00 30 33

Observatoire de la Côte d'Azur   Ministère de l'enseignement supérieur, de la recherche et de l'innovation    Université côte d'azur   CNRS 

© - oca.eu - Tout droit réservé. 2015 - 2025
TOP